Century has interests in the following mineral exploration properties located in the Provinces in Quebec and Newfoundland and Labrador:

  • The Attikamagen JV Properties are 100% owned by Labec Century Iron Ore Inc. (“Labec Century”), a joint venture company owned 60% by Century and 40% by WISCO. The Joyce Lake DSO Project is in the development stage. It is the most advanced of all deposits with a bankable feasibility study completed on April 14, 2015. The Hayot Lake Deposit, which hosts a significant taconite deposit also forms part of the Attikamagen JV Properties;
  • The Sunny Lake JV Properties are subject to a joint venture between Century and WISCO under the Sunny Lake Joint Venture Agreement. WISCO has the right to earn up to a 40% joint venture interest in the Sunny Lake JV Properties, which include the Full Moon Project with a preliminary economic assessment completed April 14, 2015 and Blackbird DSO Deposit with a NI-43101 completed April 14, 2015;
  • • The Duncan Lake Project, which Century currently has a 65% interest under an option and joint venture agreement with Augyva Mining Resources Inc. In addition, Century has entered into a Joint Venture Framework Agreement with WISCO pursuant to which WISCO may earn a 40% joint venture interest in Century’s interest in the Project. A preliminary economic assessment completed May 6, 2013

Technical Reports

All prior technical reports on Century’s properties, including Mineral Resource Estimates, Preliminary Economic Assessments and Feasibility study can be found on SEDAR.

Mineral Resource Estimates

Century currently has approximately 8.4 billion tonnes of measured and indicated resources along with approximately 11 billion tonnes of inferred resources. Learn more.

Mineral Resource Estimates
Hayot Lake Joyce Lake Full Moon Black Bird Duncan Lake Total
Mineralization Taconite DSO Taconite DSO Magnetite
Measured & Indicated1,2 24.3 Mt3 7.3 Bt 1.6 Mt 1.1 Bt 8.4 Bt
Inferred1,2 1.7 Bt 0.8 Mt 8.7 Bt 8.6 Mt 0.6 Bt 11.0 Bt
  1. Represents 100% basis at the project level
  2. As per NI 43-101 technical reports filed on SEDAR
  3. Inclusive of Proven & Probable resources of 17.7 Mt